The Challenge:
The challenge wasn’t just splitting up the structure into four pieces—it was making sure every beam was supported during erection so that when the structure was erected, the building stayed in place. If any beam’s support was scheduled for a later sequence, it could have halted construction, leaving the field team idle and forcing the fabrication shop to rush beams to the site, resulting in costly delays.
Our Expertise:
To overcome this, we meticulously reviewed the building’s framing system and made necessary adjustments to the sequencing. Our team utilized advanced 3D modeling to carefully divide the structure and rearrange the sequences as required. This meticulous approach ensured that structural stability was maintained throughout the build, thereby preventing any potential delays or costly disruptions.
The Result:
Thanks to our proactive planning, we completed the project without any delays. Every beam was supported at the right time, ensuring the structure’s stability and keeping the project on track. This project really shows our skill in handling complex sequencing. It proves that careful planning and attention to detail in steelwork can make all the difference in delivering a successful result.